Blog de construção

Venice water Taxi just about complete.

Por IanL1 1 inscrição 4 Mai 2025
15Gostos
3Comentários
Capítulo 01 / 01

Capítulos · 1 · desloque para ler

IanL1 Mensagem de abertura

Venice water Taxi just about complete.

Its been a while since I have updated you all on my Venice water taxi build. Over the last few months I have been working on the canopy and the hand rails, used to get on board. I am just about ready to give her her first sea trials in open water. The swimming pool here at the village I live in is not large enought to give her a good run, with out the fear of hitting the sides. It was really tricky machining the 0.75 mm pins for the canopy hinges but with a very sharp and pointed HSS tool it worked OK. Also I decided to glue the canopy top along the edges, where the frame goes through, as I dont have a machine to sew, so it all got very difficult. The end result was perfect as I used clear silicon sealant. The hand rail support flanges were turned from 5/16 dia brass with a 2 mm hole and soldered on the back face, which worked well. They are glued on with 5 minute araldite. My next update will cover the launch and hopefully a video of her steaming along. I am not sure if the notes for each photo is attached but if not I am sure you will all get the idea. Let me know if you have any questions. Cheers Ian
Gostado por alexandre and Ray and

Delete this post?

Será removido do site.

Descartar este rascunho?

O seu rascunho será eliminado e não pode ser recuperado.

Tem um rascunho por terminar

O que gostaria de fazer com isso?