Blog de construção

Pacific North West log tug

Por Chum444 3 inscrições 7 Out 2026 — 25 Out 2026
14Gostos
10Comentários
0 seguidores
Capítulo 01 / 03

Capítulos · 3 · desloque para ler

Chum444 Mensagem de abertura 54

Pacific North West log tug

Three photos of the real boat.
Log tugs had very little freeboard since the deck crew often needed to jump from the tug’s deck to the log boom & back.Doesn’t sound like fun to me!
1/24 scale fiberglass hull.
The first deviation from the 1:1. A steerable Kort nozzle & a cage to prevent floating loose logs from damaging the Kort &/ or the prop.
Preforming some parts.
Preformed components for bulwarks & shear clamps.
380 size brushed motor with gear reducer.
I’ve had this hull for a few years & am now getting to building a model of Harken Towing’s tug HARKEN No 1. As per my usual it will not be an exact replica of the real boat. Sometimes a scale model has to accommodate needs not found in the 1:1.
So, here we go. This class of tug boat was the workhorse of the log boom (essentially a floating group of numerous logs) towing industry in the Pacific north west. Towing these log arrays on the PNW rivers, notably the Fraser, was the most economical method of getting timber from the forests to the sawmills. I don’t know if the log towing industry still exists as a going business, but I have doubts since many of the log tugs have been repurposed. Anyone herein who has historical knowledge of the industry &/or its current status please share any information.
Gostado por DWBrinkman and RNinMunich and

Progress

Into the ballast tank. With the battery located a bit forward of amid ship it will take a bit over 2 lbs or 1 kg to get to the intended waterline.
With tugs & workboats I prefer to paint the hull early on. Then the scrapes, dents, bangs, etc that occur during the building process add realistic weathering to the finished build.
I’ve been working on the hull recently. Finalized the location of the motor & gear reducer & installed the mounting foundations. For me this is always a milestone event allowing hull work to move ahead.
Gostado por Fishercat and chugalone100 and

Structural work

Bulwark installation. Shims are to create constant width between hull side & bulwark. Gap is closed by a covering board.
Top view.
Beginning to construct the sheer clamp. Aft deck will be mated to bulwark 1/16” above the bottom edge.Also included, a note to self.
One of my favorite parts of a build,; the structural system to support the deck. As usual, I have no plans for construction. Size of components & location derived from proportional measurements from photos. I was generously provided with house & trunk cabin measurements taken from the real tug by another builder. There is also a lot of TLAR that enters the equation. (And plain guesswork).
The first real challenge has been the stepped foredeck. Many logging industry tugs, particularly those involved with towing log booms, have VERY little freeboard since the deckhand has to leap back & forth between the tug & the towed log boom. So creating a low freeboard stepped deck has me thinking.