Blog de construção

Perkasa

Por Northumbrian 13 inscrições 16 Out 2015 — 9 Dez 2015
25Gostos
19Comentários
Capítulo 02 / 13

13 capítulos · Página 1 de 2

Perkasa

I bought this from a mate (tall tom) the hull was started and i have filled & rubbed it down / fibre glassed the inside and installed the two 5mm shafts & two brushless motors ( more info on the running gear as it happens) there is still a lot to do it will keep me busy over the winter
Gostado por DessieB and Northumbrian and

Perkasa

after a lot of cutting & sanding I finally got the doorways finished (I hate balsa wood) I have given it a coat of sand & seal then a 1st coat of undercoat I will let it dry then rub it down ready for the 2nd coat of undercoat 😑
Gostado por sandkb and hansv and

Perkasa

The torpedoes & racks are in place the stack lockers are ready to rub down then seal & undercoat,The next job is to paint the bottom black
Gostado por sandkb and Ballast and

Perkasa Fittings

the Perkasa fittings arrived today from Battlecraft so lots to get on with but before they get attached I have to varnish the hull and make and epoxy some wedges onto the prop shafts to stop any vibration its all good fun 💭
Gostado por sandkb and hansv and

Perkasa progress

I have added a few more fittings ie cooling stack Bofors & Oerlikon guns lockers hatches radar & the anchor is in progress the torpedoes & racks are nearly finished when the deck is finished i will fit the stanchions
slowly getting there 💭
Gostado por sandkb and hansv

More Pictures

I got a little bit more done tonight thirsty work time for a beer 😊
Gostado por sandkb

Delete this post?

Será removido do site.

Descartar este rascunho?

O seu rascunho será eliminado e não pode ser recuperado.

Tem um rascunho por terminar

O que gostaria de fazer com isso?